Definable features of work:
|
Scope of Work: This was a 3‐phased project during the Spring to Fall of 2022: Phase 1 was renovation of the main Administration Building (14,100 sq.ft.); Phase 2 was complete interior renovation of the toilet rooms, offices, and reception (3,500 sq.ft.); and Phase 3 was a new ground‐up Storage Building (2100 sq.ft.) and paving (2000 sq.ft. Phase 1 consisted of interior renovation to the existing offices, conference rooms, gymnasium, and miscellaneous spaces. All new Air Unit Ventilators were installed throughout, along with new ducted distribution systems. Phase 1 also included upgraded electrical distribution, low voltage and audio‐visual systems. Structural steel was installed for a new operable partition in the gymnasium. Phase 2 included new plumbing rough‐ins, masonry wall rebuilds, epoxy floors, and new toilet partitions for new restrooms. Phase 3 was a new ground‐up wood/truss framed storage building. Additional storm sewer work was included for site drainage. Value: $2,800,000 |