Definable features of work:
|
Scope of Work: This schedule‐critical project consisted of major interior demolition and new administration office buildout, along with exterior renovations, of a 95,512 square foot former health resource center. Extensive new building infrastructure systems were installed to include: all new mechanical equipment, new electrical service, switchgear, EM generator, new fire suppression system, and plumbing rough‐ins. On the exterior, a new TPO roof was installed. A completely new building envelop was installed to include: new insulated metal cladding metal system, spray‐applied air barrier, and windows. This project kicked off at start of the COVID‐19 Pandemic, and the project was considered essential to the School District’s operations. Troop created and implemented a new internal COVID‐19 Safety Plan to ensure onsite worker safety while maintaining the schedule‐critical tempo on the project. Despite the pandemic’s labor shortage effects and manufacturer’s delays, Troop was able to meet the scheduled completion date, with zero safety issues, by strictly enforcing CDC and OSHA guidelines. The 95,512 square foot roof was successfully installed during the weest month of May on record. Troop Contracting provided full construction services to include site supervision, project management, and carpentry / laborer. Value: $6,800,000 |