Troop Contracting (630) 568-5252 Patriotically Building America
(630) 568-5252 contact@troopcontracting.com
  • HOME
  • ABOUT TROOP
    • ABOUT / MISSION
    • OUR TEAM
    • PHILANTHROPY
  • Our Work
    • ​LIBRARIES / SCHOOLS / CHURCHES
    • MUSEUMS
    • GOVERNMENT
    • MEDICAL
    • ​COMMERCIAL / MULTI-TENANT
    • ADDITIONS / GROUND-UP
    • RETAIL
  • CLIENTS / TESTIMONIALS
  • Bid Room
  • News / Videos
  • Contact
  • HOME
  • ABOUT TROOP
    • ABOUT / MISSION
    • OUR TEAM
    • PHILANTHROPY
  • Our Work
    • ​LIBRARIES / SCHOOLS / CHURCHES
    • MUSEUMS
    • GOVERNMENT
    • MEDICAL
    • ​COMMERCIAL / MULTI-TENANT
    • ADDITIONS / GROUND-UP
    • RETAIL
  • CLIENTS / TESTIMONIALS
  • Bid Room
  • News / Videos
  • Contact
©
Troop Contracting (630) 568-5252 Patriotically Building America

Kankakee Community College—Technology Center PH 2; 
Kankakee, IL; 2022 

Picture

Definable features of work:​​​​​
​​
  • Concrete
  • Masonry
  • Structural Steel
  • Gypsum Board Assemblies
  • Vinyl Graphics
  • Millwork
  • Doors / Frames / Hardware
  • Glazing & Storefronts
  • Acoustical Ceiling Tile
  • Specialty Ceiling Systems
  • Multiple flooring finishes
  • Auto Exhaust System
  • Mechanical & Electrical
  • Plumbing & Fire Protection
  • Excavations & Site Utilities 



​Scope of Work:

Project consisted of a 24,500 sq. ft. interior renovation to include an Industrial Lab (showcase), Classrooms, Forensics Lab / Virtual Shooting Range, Offices, and Lounge Space. Work included demolition, structural modifications, new finishes and doors/frames/glazing. Additionally, all new mechanical, electrical, plumbing, and fire suppression systems were roughed‐in. An Auto‐Exhaust System was installed in the Automobile Lab space.

Unique to this project was existing IT equipment / closet that had to remain operational
during our construction phase, only going off‐line when the new IT closet was
operational. Additionally, the unique design of the architectural finishes required Troop
to pre‐emptively plan / coordinate prior to layout of wall framing to ensure that everything in lined up per the design intent.
​

A new fire main service was brought into the building as part of this project, and Troop actively coordinated the PH 2 fire suppression system tie‐in with the prior construction. 
​

Value: $3,550,000 


Picture
Picture

DUNS #: 965504892
Cage Code: 66XY7
GC License: TGC027109
NAICS: 236220 (primary)
Other NAICS: 238130, 238310, 238350, 238320, 238330, 236210, 238110, 238210, 238220

Certifications: Certified Veterans Enterprise (CVE); Service-Disabled Veteran-Owned Business; LEED AP BD+C; OHSA 30HR; US Army Corps of Engineers Construction Quality Control Management for Contractors

Quick Contact:

Submit



© 2018-2022 Troop Contracting Inc  //  All Rights Reserved  // Website by LislDesign.com
Website by LislDesign.com