Definable features of work:
|
Scope of Work: Under current JOC program with the 88th Army Reserve, Troop Contracting replaced an existing 40 T YorkSplit System A/C Unit, which served AHU#3, with a high efficiency R410 unit. In addition to the replacement unit, an evaporation coil in AHU #3 was replaced, along with a comprehensive upgrade to existing HVAC controls to support the new unit. Troop provided all hardware and software engineering, including start‐up, temperature controls, and programming/commissioning of the complete system. Replacement of the existing Alerton APEX‐LT with Aleton BACnet Control Module global connector was incorporated. A new PC, with required software, and printer were included in the final installation. Value: $252,000 Architect reference available upon request. |